Sivu: 26

OPERATIONS – OTHER AREAS FRANCE The French fields are mature production assets which have been onstream for many years. In the Paris Basin (WI 43–100%) and Aquitaine Basin (WI 50%), cost effective drilling intervention and work over activities are ongoing to maintain production levels. Capital investment has been made in several fields in the Paris Basin, leading to increases in production rates and reserves. Facilities and infrastructure are in place with excess capacity to enable a rapid development of new reserves. The French assets exhibit low decline and predictable long-term production for Lundin Petroleum. Further exploration opportunities and exploitation of contingent resources are being pursued to increase French reserves. Paris Basin Lundin Petroleum operates ten production licences and six exploration licences. The Grandville development plan was approved in 2010 and comprises an eight well drilling programme, a new gathering system and a new production centre. Two wells have been drilled in 2011 and production facilities are substantially completed. Six further wells and commissioning of production facilities are planned for 2012. A further assessment of the development may lead to four additional wells being drilled to access contingent resources in this area. Development studies in other Paris Basin fields are ongoing. Two conventional exploration wells are planned for 2012 in the Est Champagne and Val des Marais exploration permits. FRANCE KEY DATA Reserves (MMboe) Contingent resources (MMboe) Average net production per day (Mboepd) Net turnover (MUSD) Sales price achieved (USD/boe) Cost of operations (USD/boe) Operating cash flow contribution (USD/boe) 2011 25 10 3 129 111 19 65 2010 22 7 3 94 79 17 42 Aquitaine Basin Lundin Petroleum has a 50 percent non-operated interest in five production licences. One of the largest fields in Aquitaine is the Courbey field with a current recovery factor of less than ten percent. Seismic reprocessing has been completed and further field development studies are ongoing and scheduled for completion in 2012. Studies to identify the potential for infill drilling in the Les Mimosas and Les Tamaris fields are ongoing. The installation of a pipeline in 2011 to export oil from Les Mimosas to the Les Arbousiers facilities has been deferred to 2012. 24 Lundin Petroleum ANNUAL REPORT 2011

Sivu: 26Sivu: 27Sivu: 28Sivu: 29Sivu: 30Sivu: 31Sivu: 32Sivu: 33Sivu: 34Sivu: 35Sivu: 36Sivu: 37Sivu: 38Sivu: 39Sivu: 40Sivu: 41Sivu: 42Sivu: 43Sivu: 44Sivu: 45Sivu: 46Sivu: 47Sivu: 48Sivu: 49Sivu: 50Sivu: 51Sivu: 52Sivu: 53Sivu: 54Sivu: 55Sivu: 56Sivu: 57Sivu: 58Sivu: 59Sivu: 60Sivu: 61Sivu: 62Sivu: 63Sivu: 64Sivu: 65Sivu: 66Sivu: 67Sivu: 68Sivu: 69Sivu: 70Sivu: 71Sivu: 72Sivu: 73Sivu: 74Sivu: 75Sivu: 76Sivu: 77Sivu: 78Sivu: 79Sivu: 80Sivu: 81Sivu: 82Sivu: 83Sivu: 84Sivu: 85Sivu: 86Sivu: 87Sivu: 88Sivu: 89Sivu: 90Sivu: 91Sivu: 92Sivu: 93Sivu: 94Sivu: 95Sivu: 96Sivu: 97Sivu: 98Sivu: 99Sivu: 100Sivu: 101Sivu: 102Sivu: 103Sivu: 104Sivu: 105Sivu: 106Sivu: 107Sivu: 108Sivu: 109Sivu: 110Sivu: 111Sivu: 112