OPERATIONS – SOUTH EAST ASIA INDONESIA Lematang Block The Singa gas field was brought on stream in May 2010. Initial production difficulties led to low production rates, but as of fourth quarter 2010 the field has been producing steadily at approximately 30 MMscfd of gross gas. This production level is below initial forecasts due to wellhead temperature and produced liquids constraints. Work is ongoing to increase production levels. Net reserves are estimated at 4.3 MMboe (26 bscf ). A gas sales agreement has been signed that will supply gas to customers in West Java. Lundin Petroleum working interest in the Lematang Block of 25.88 percent. Salawati Basin and Island In 2010, Lundin Petroleum completed the sale of its interests in the Salawati Island and Basin blocks to RH Petrogas for a consideration of MUSD 37.1 effective 1 January 2010 with additional payments due in the event of further field development of up to MUSD 3.9. Further exploration potential A significant new 3D offshore seismic was completed in 2010 on the Baronang and Cakalang blocks. On the onshore Rangkas Block, 2D seismic acquisition is ongoing and will be completed during 2011 with exploration drilling planned to commence in 2012. In December 2010, Lundin Petroleum was awarded a new production sharing contract (PSC) for the offshore South Sokang Block (60% operated interest) which carries a seismic commitment. In March 2011 Lundin Petroleum was awarded a PSC for the Gurita Block (WI 100%). 1 INDONESIA – KEY DATA1 Reserves (MMboe) Contingent resources (MMboe) Average production per day (Mboepd) Net turnover (MUSD) Sales price achieved (USD/boe) Cost of operations (USD/boe) Operating cash flow contribution (USD/boe) 2010 4 2 2 40 65 24 11 2009 14 4 2 37 61 23 14 Includes Salawati Basin and Island up to the date of disposal. Reserves and Contingent resources as at 31 December 2010 excludes Salawati Basin and Island reserves. OUR PEOPLE JONI ERWOKO Senior Geophysicist Jakarta, Indonesia Joni has worked for Lundin Petroleum since 2008 and has been working on prospect generation on our Indonesian assets. He has over 15 years of experience and has held various geological and geophysical positions. 25

Sivu: 27Sivu: 28Sivu: 29Sivu: 30Sivu: 31Sivu: 32Sivu: 33Sivu: 34Sivu: 35Sivu: 36Sivu: 37Sivu: 38Sivu: 39Sivu: 40Sivu: 41Sivu: 42Sivu: 43Sivu: 44Sivu: 45Sivu: 46Sivu: 47Sivu: 48Sivu: 49Sivu: 50Sivu: 51Sivu: 52Sivu: 53Sivu: 54Sivu: 55Sivu: 56Sivu: 57Sivu: 58Sivu: 59Sivu: 60Sivu: 61Sivu: 62Sivu: 63Sivu: 64Sivu: 65Sivu: 66Sivu: 67Sivu: 68Sivu: 69Sivu: 70Sivu: 71Sivu: 72Sivu: 73Sivu: 74Sivu: 75Sivu: 76Sivu: 77Sivu: 78Sivu: 79Sivu: 80Sivu: 81Sivu: 82Sivu: 83Sivu: 84Sivu: 85Sivu: 86Sivu: 87Sivu: 88Sivu: 89Sivu: 90Sivu: 91Sivu: 92Sivu: 93Sivu: 94Sivu: 95Sivu: 96Sivu: 97Sivu: 98Sivu: 99Sivu: 100Sivu: 101Sivu: 102Sivu: 103Sivu: 104Sivu: 105Sivu: 106Sivu: 107Sivu: 108