Annual Report 2010

featimgSivu: 1Sivu: 2Sivu: 3Sivu: 4Sivu: 5Sivu: 6Sivu: 7Sivu: 8Sivu: 9Sivu: 10Sivu: 11Sivu: 12Sivu: 13Sivu: 14Sivu: 15Sivu: 16Sivu: 17Sivu: 18Sivu: 19Sivu: 20Sivu: 21Sivu: 22Sivu: 23Sivu: 24Sivu: 25

Sivu: 26

OPERATIONS – SOUTH EAST ASIA SOUTH EAST ASIA HIGHLIGHTS MALAYSIA Lundin Petroleum has built an exciting portfolio of exploration assets in Malaysia with the definition of two core areas offshore Sabah and Peninsular Malaysia. Over 4,000 km2 of new 3D offshore seismic was acquired between 2009 and 2010 and interpretation and prospect generation on licences PM308A (WI 35%), PM308B (WI 75%) and SB303 (WI 75%) is now completed. During 2010, an additional PSC was signed covering the 6,230 km2 of Blocks SB307 and SB308. Exploration drilling is expected to commence in 2011. A five back-to-back well programme is planned using the Offshore Courageous drilling rig in licences SB303 (two wells), PM308A (two wells) and PM308B (one well). Total net unrisked potential resources associated with the 2011 exploration programme are 136 MMboe. » Malaysia drilling programme commences » Singa gas field comes on stream » Salawati assets divested » 4 new exploration blocks awarded in region LUNDIN PEOPLE OUR PEOPLE YEE AH ZULYUSRI BIN AHMADCHIM ZAINAL ABIDIN (Zul) Geophysicist Kuala Lumpur, Malaysia Job title: Procurement Executive Location: Kuala Lumpur, Yee joined Lundin Petroleum in Malaysia 2008 as a geophysicist working on the upcoming exploration Zul has worked for Lundin programme in Malaysia. Petroleum since 2008 and has been involved with oil and gas project work in South East Asia since 2001 In parallel, the Company is evaluating new development opportunities. The Tiga Papan discovery located in licence SB307 is being assessed as a future development. Ongoing reprocessing of existing 3D seismic and feasibility studies will determine an appraisal drilling strategy. VIETNAM Lundin Petroleum has a 33.33 percent working interest in Block 06/94 in the Nam Con Son Basin, offshore southern Vietnam. There are a number of oil and gas discoveries in the basin. During 2010, two wells were drilled. However, with the exception of very thin uncommercial gas pay, the wells were unsuccessful and were plugged and abandoned. The partnership is currently negotiating the possibility of an extension to the licence period for further technical evaluations. OUR PEOPLE AHMAD ZULYUSRI BIN ZAINAL ABIDIN (Zul) Procurement Executive Kuala Lumpur, Malaysia Zul has worked for Lundin Petroleum since 2008 and has been involved with oil and gas project work in South East Asia since 2001. 24 Lundin Petroleum ANNUAL REPORT 2010

Sivu: 26Sivu: 27Sivu: 28Sivu: 29Sivu: 30Sivu: 31Sivu: 32Sivu: 33Sivu: 34Sivu: 35Sivu: 36Sivu: 37Sivu: 38Sivu: 39Sivu: 40Sivu: 41Sivu: 42Sivu: 43Sivu: 44Sivu: 45Sivu: 46Sivu: 47Sivu: 48Sivu: 49Sivu: 50Sivu: 51Sivu: 52Sivu: 53Sivu: 54Sivu: 55Sivu: 56Sivu: 57Sivu: 58Sivu: 59Sivu: 60Sivu: 61Sivu: 62Sivu: 63Sivu: 64Sivu: 65Sivu: 66Sivu: 67Sivu: 68Sivu: 69Sivu: 70Sivu: 71Sivu: 72Sivu: 73Sivu: 74Sivu: 75Sivu: 76Sivu: 77Sivu: 78Sivu: 79Sivu: 80Sivu: 81Sivu: 82Sivu: 83Sivu: 84Sivu: 85Sivu: 86Sivu: 87Sivu: 88Sivu: 89Sivu: 90Sivu: 91Sivu: 92Sivu: 93Sivu: 94Sivu: 95Sivu: 96Sivu: 97Sivu: 98Sivu: 99Sivu: 100Sivu: 101Sivu: 102Sivu: 103Sivu: 104Sivu: 105Sivu: 106Sivu: 107Sivu: 108